Triton Aqua Channel Outlet Complete In Channel

Triton
£18.48
Unit price per

SKU:102755

Quantity

Consists of a 90° PVC bend and a PVC male coupling (with swivel action) which is fitted to the base of the Aqua Channel to allow water to be taken from it to the water collection point (sump and pump) via a 40mm OD solvent weld PVC pipe.

Channel Outlet
Consists of a 90 degree PVC bend and a PVC male coupling (with swivel action) which is fitted to the base of the Aqua Channel to allow water to be taken from it to the water collection point (sump and pump) via a 40mm OD solvent weld PVC pipe.
Aqua channel is a PVC drainage conduit designed to control water ingress in below ground situations. It is fitted around the perimeter of the floor at the vulnerable wall/floor junction and is particularly suited for use in conjunction with Platon cavity drain membranes.


Water entering the building through the walls is controlled behind the Platon membrane and diverted down to the Aqua Channel at the base of the wall. The water enters the Aqua Channel through pre-drilled drainage holes and must then be diverted to a suitable drainage point, either natural or a sump and mechanical pump.
As a general rule, a minimum of one sump/discharge point is required for every 50 linear metre run of Triton Aqua Channel.

Consists of a 90° PVC bend and a PVC male coupling (with swivel action) which is fitted to the base of the Aqua Channel to allow water to be taken from it to the water collection point (sump and pump) via a 40mm OD solvent weld PVC pipe.

Channel Outlet
Consists of a 90 degree PVC bend and a PVC male coupling (with swivel action) which is fitted to the base of the Aqua Channel to allow water to be taken from it to the water collection point (sump and pump) via a 40mm OD solvent weld PVC pipe.
Aqua channel is a PVC drainage conduit designed to control water ingress in below ground situations. It is fitted around the perimeter of the floor at the vulnerable wall/floor junction and is particularly suited for use in conjunction with Platon cavity drain membranes.


Water entering the building through the walls is controlled behind the Platon membrane and diverted down to the Aqua Channel at the base of the wall. The water enters the Aqua Channel through pre-drilled drainage holes and must then be diverted to a suitable drainage point, either natural or a sump and mechanical pump.
As a general rule, a minimum of one sump/discharge point is required for every 50 linear metre run of Triton Aqua Channel.